1SUBSTRUCTURE

Excavation to be done till hard stratum is reached.

The construction methodology adopted for the construction is based on the structural design and strict adherence to the design is mandatory.

After casting the foundational elements, the filling of excavation pits is made by the locally available well graded soil (Kaki bontha/Red soil based on the ease of availability)

Bore well is dug till the depth of 150-200 feet and Sudhakar/Prince CPVC pipes are used for casing.

Texmo Taro motor pump to be installed (Warranty cards to be provided to Client)

2 STRUCTURE

RCC Framed structure, Concrete of Grade M 20 and Tata steel shall be used for reinforcement. Ultratech cement is used for mortar preparation

3WALLS

External walls of 9 inch thick and internal walls of 4 inch thick to be constructed with Class 1 Tripuranthakam/Miriyalaguda or equivalent quality.

For plastering Ultratech cement and fine sand is used in mortar preparation Boundary wall of 4 inch thick to be provided all around.

4 DOORS & WINDOWS

Main door of Teak wood along with Teak wood frame (Design, Finishes and accessories of doors shall be of client choice) along with mesh double door

All other doors are of flush doors with laminate finish and Neem wood frame Bathroom doors are of WPC (Moisture and termite resistant)

All Windows are of UPVC with Iron safety grills and mesh.

Entrance gate to be made of Zinc.

5FLOORING

White Marble Sheets (Premium Quality) to be laid in visible areas like Living room and Dining, and pieces for Bedrooms, Granite or Tiles to be used in Kitchen as per the customer choice

Parking tiles of premium quality to be provided

Bathroom tiles of skid resistant and dadoing up to 7 feet height

Provision for plantation along the corridors in ground floor

6 KITCHEN

Granite cooking platform, 2 feet height glazed tiles of premium quality. Kitchen sink of adequate size made of granite

All taps of Gravity/L&K or equivalent Quality (if you insist on other brands, we can negotiate)

7ELECTRICAL

Concealed copper wiring FINOLEX, with adequate points, AC Points in Master bed rooms and Geyser points in two bathrooms, Goldmedal switches.

Individual meters for all housing units (Client scope)

8 SANITARY

Ashirvad/Prince/Astral, Sudhakar CPVC pipe line.

All bathroom accessories confining to ground floor are as per the choice of customer, however water closets in remaining floors shall be of following companies like Asian /Cura/Parryware

All showers and taps of Gravity Company or equivalent. Septic tanks to satisfy the requirement of independent housing units and water storage tanks to be provided to satisfy the requirement of independent housing unit.

9 CEILING

False ceiling with Gypsum sheets (Gyproc) embedded in frame (Saint Gobain /JSW or equivalent), to be provided in all rooms except kitchen, washrooms and external corridors.

Two coats of putty and primer to be applied before painting, the choice of colour of paints to be decided by the client.

10 STAIRCASE

Stainless steel frame used for railing, Steps to be covered with granite or marble as per the choice of client.

Slab to be provided instead of sheets to protect staircase from rainfall and other climatic conditions.( But additional slab area shall be counted as an extra scope)

11 PAINTING

Two coats of putty with primer is applied.

Two coats of paint (Asian paints Premium or its equivalent)

12 WOOD WORK

Plywood of 18mm thick (wherever necessary) with sunglass finish.

TTV Unit and crockery Unit to be provided.

However the client has the discretion to choose colours, type of laminates, Accessories related to wardrobes like door handles etc.

Client also has the discretion to choose core material other than plywood like MDF or HDHMR.

13 ELEVATION

As per the design.